Direct answer: A safe carriage board replacement on a solvent flex machine follows five stages: confirm the old board is really faulty and the new board is an exact match; record all settings, head serial numbers and head voltages before removal; install the new board with power off, correct cable routing and ESD precautions; check firmware compatibility and enter each Konica head’s correct voltage and temperature settings before the first print; then run nozzle checks, head alignment, bi-directional calibration and a production-length test print. Skipping the first two stages is the most common reason a new board fails or a new head burns soon after replacement.
A careful flex carriage board replacement protects both the new board and your expensive Konica heads, and this checklist walks through every stage.

Table of Contents
This checklist is written for flex unit owners and technicians working on 10 ft and 16 ft machines with Konica KM512i or KM1024i heads on BYHX, Hoson or similar board systems. It complements our guides on telling a cable fault from a board fault and carriage board compatibility. Use it as a framework, and follow your machine manufacturer’s specific instructions where they differ.
Stage 1: Confirm the diagnosis
A carriage board should be replaced only after other likely causes are ruled out. Before ordering, confirm:
- Head cables and adapter boards have been tested by swapping
- The main data link between mainboard and carriage has been checked
- Carriage power supply output is normal
- Earthing and input voltage are acceptable
- Heads suspected of shorting have been tested and isolated
- Ink supply problems have been ruled out for missing colours
Replacing a board when the real cause is a shorted head or damaged cable can destroy the new board on first power-up. Our article on burnt head boards after a Konica head change explains this chain reaction.
Stage 2: Match the replacement board
| Check | Old board | New board |
|---|---|---|
| Board brand (BYHX, Hoson, other) | Record | Must match |
| Head type (KM512i, KM1024i) | Record | Must match |
| Head count (4H, 8H) | Record | Must match |
| Version code | Record from label | Same or approved |
| Greyscale or binary | Record | Must match |
| Firmware version | Record from software | Compatible |
| Connector layout | Photograph | Compare visually |
Ask your supplier to confirm in writing that the board suits your mainboard and software version. Check whether the board is new, refurbished or repaired, and what warranty and testing terms apply.
Stage 3: Record everything before removal
This stage takes thirty minutes and can save days. With the software still able to read settings (if possible), record:
- Head serial numbers and positions: Note which head is in which position.
- Head voltages: Record the voltage set for each head in the software and compare with the value on each head’s label or test sheet.
- Head temperature settings: Target temperature for each head or head group.
- Calibration values: Head alignment, bi-directional offset, step calibration, overlap settings.
- Print modes and colour settings: Any custom modes used for production.
- Software and firmware versions: From the “About” or system information screen.
- Photos: Board in place, every connector, cable routing, and board labels.
Many board systems allow you to export or back up parameter files. If yours does, save a copy to a USB drive and to another computer.
Stage 4: Safe removal
- Park the carriage at the capping station and seal heads to prevent drying during the job.
- Switch off the machine and disconnect mains power. Wait several minutes for capacitors to discharge.
- Wear an anti-static wrist strap connected to the machine frame, or touch the frame before handling boards.
- Label every cable with its connector position, even if connectors look unique.
- Disconnect head cables by pulling straight, after releasing locks.
- Disconnect the main data link carefully; protect fibre ends with caps if fitted.
- Remove mounting screws and lift the board out without bending it.
- Store the old board in an anti-static bag for repair assessment or warranty return.
While the board is out, inspect the carriage for ink residue, dust and damaged cables. Clean and replace as needed.
Stage 5: Pre-installation checks on the new board
- Inspect the new board for transport damage, bent pins or loose components
- Compare connector layout with photos of the old board
- Check that jumpers or DIP switches (if present) match the old board’s settings
- Confirm that heads to be connected have been tested and are not shorted
- Inspect all head cables; replace any that are creased, burnt or contaminated
After a burnt-board event, many technicians replace all head cables as standard practice because a damaged cable can carry the fault to the new board.
Stage 6: Installation
- Mount the board securely using all screws and spacers.
- Connect the main data link first, ensuring it is fully seated and correctly routed.
- Connect power cables to the board.
- Connect head cables one by one, inserting straight and fully, engaging locks.
- Connect sensors, fan and temperature lines.
- Double-check every connector against your labels and photos.
- Route cables away from ink lines and sharp edges, with drip loops where useful.
- Refit covers, making sure no cable is pinched.
Stage 7: First power-up and firmware
For the first power-up, some technicians disconnect heads and power the board alone to check detection and firmware, then connect heads afterwards with power off. Follow your board supplier’s recommendation.
- Check that the software detects the new board and shows the correct version
- Confirm firmware compatibility; update only if your supplier confirms the correct firmware file
- Never interrupt a firmware update; ensure stable power and a UPS for the PC
- If the software reports a version mismatch, stop and contact your supplier rather than forcing an update
Stage 8: Head voltage and temperature settings
This is the most critical stage for head life.
- Enter each head’s voltage from its label or test sheet, for the correct head position.
- Verify each value twice. A wrong digit can damage a head.
- Enter head temperature targets as before.
- Allow heads to reach temperature before nozzle checks.
New boards may ship with default voltages that do not match your heads. Never print with default values. For more on voltage, see our upcoming article on Konica head voltage settings.
Stage 9: Nozzle checks and calibration
| Step | What to check |
|---|---|
| Nozzle check | All heads printing all nozzles; no random firing |
| Head cleaning (if needed) | Standard cleaning only; no heavy purges unless required |
| Mechanical alignment | Head height and angle consistent |
| Software head alignment | Colour-to-colour and head-to-head registration |
| Bi-directional calibration | Sharp lines in both print directions |
| Step / feed calibration | No banding from media advance |
| Test print | Production mode, at least 30 minutes |
Compare results with recorded calibration values. Large differences may indicate a setup error.
Stage 10: Monitoring after replacement
For the first week, monitor:
- Head temperature readings for stability
- Any intermittent head dropouts or random firing
- Board and carriage temperature during long jobs
- Print quality consistency across shifts
Record the board installation date, serial number, supplier and warranty terms in your maintenance log. This helps with any warranty claim later.
Common flex carriage board replacement mistakes to avoid
- Not recording head voltages before removal
- Using default voltages on a new board
- Reusing damaged head cables after a burnt board
- Connecting cables with power on
- Forcing firmware updates without supplier confirmation
- Skipping calibration because “it looks fine”
- Failing to find the root cause of the original failure (leak, surge, shorted head)
Printable checklist summary
| # | Task | Done |
|---|---|---|
| 1 | Diagnosis confirmed; cables, heads, power ruled out | ☐ |
| 2 | New board matched: brand, head type, head count, version | ☐ |
| 3 | Settings, voltages, calibration and photos recorded | ☐ |
| 4 | Power off, ESD precautions, cables labelled | ☐ |
| 5 | Carriage cleaned; damaged cables replaced | ☐ |
| 6 | New board installed; connections double-checked | ☐ |
| 7 | Firmware compatibility confirmed | ☐ |
| 8 | Head voltages and temperatures entered and verified | ☐ |
| 9 | Nozzle check, alignment, calibration completed | ☐ |
| 10 | Test print run; monitoring plan in place | ☐ |
Plan the job to minimise downtime
A flex carriage board replacement often happens during a busy period, so planning matters. Before the technician arrives:
- Confirm the replacement board has arrived and matches your old board’s photos
- Arrange new head cables if the failure involved burning or shorts
- Schedule the job at the start of a day, not late evening, so problems can be solved with suppliers open
- Move urgent jobs to a partner unit or second machine if possible
- Have test media and ink ready for calibration
- Make sure the PC, software installer and any dongle are available
Good planning can turn a two-day disruption into a half-day job.
Who does what
| Role | Responsibilities |
|---|---|
| Owner | Approves purchase, confirms supplier warranty, arranges downtime, keeps records |
| Operator | Records symptoms, takes photos, exports settings, assists with test prints |
| Technician | Diagnosis, removal, installation, firmware, voltage entry, calibration |
| Supplier | Confirms compatibility, provides firmware files, supports troubleshooting |
Clear roles prevent the common situation where everyone assumes someone else recorded the head voltages.
What to include in your parameter backup
Different board systems store different data, but a complete backup usually includes:
- Exported parameter or configuration files from the print control software
- Screenshots of head settings: voltage, temperature, head order and direction
- Screenshots of calibration pages: alignment, bi-directional, step and overlap
- Print mode settings and any custom colour profiles in the RIP
- Software version, firmware versions and licence or dongle details
- Photos of head labels showing serial number and voltage
Store backups in at least two places: a USB drive kept with the machine records, and a cloud folder or second computer. Update them after every major service, not only before a board replacement.
Worked example: a smooth replacement
A 10 ft, eight-head Konica 512i machine shows weak jetting on heads 5–8 after a monsoon storm. The technician tests cables and the carriage power supply, finds them normal, and confirms a faulty driver section on the carriage board. The owner sends photos to the supplier, who confirms a matching BYHX board version. Before removal, the operator exports parameters and photographs head labels. The new board is installed in the morning. Firmware matches without updating. The technician enters each head’s voltage, runs nozzle checks, aligns heads and calibrates. By mid-afternoon, the machine is printing production jobs. The old board goes for repair as a spare. Total downtime: about six hours.
Warranty documentation
Keep the following for every board you install:
- Invoice with exact model, version and serial number
- Supplier warranty terms
- Installation date and technician’s name
- Photos of the installed board and connections
- Record of head voltages entered
- Any problems observed during the first weeks
If the board fails within warranty, these records make the claim straightforward. Without them, suppliers may dispute whether the failure was caused by incorrect installation, a leak or a surge. Our flex machine electronics series will cover warranty claims in detail.
Root cause: the step most people skip
A new board fixes the symptom, but not necessarily the cause. Before closing the job, ask why the old board failed. Common root causes include a damper leak that let ink reach connectors, a lightning surge with poor earthing, a shorted head, a damaged cable, overheating from a dead carriage fan, or wrong voltage settings after a previous head change. If the cause is not fixed, the new board may fail in the same way, sometimes within days.
| Likely root cause | Corrective action |
|---|---|
| Ink leak | Replace faulty damper or fitting; clean carriage; improve weekly inspection |
| Surge or lightning | Check earthing; add surge protection; review stabiliser |
| Shorted head | Test and replace head; replace its cable |
| Overheating | Replace carriage fan; clean dust; improve room ventilation |
| Wrong voltage | Introduce a head register; double-check entries |
| Cable damage | Replace cable; correct routing; check cable chain |
Record the root cause and the corrective action in your maintenance log alongside the flex carriage board replacement details.
Testing the old board afterwards
Once the machine is running with the new board, send the old board to a competent electronics technician for assessment. If it can be repaired economically, it becomes a valuable backup. If not, the technician’s report may still reveal the root cause, such as corrosion pattern from ink or burn marks typical of a surge, which helps you prevent the next failure.
Questions to ask your technician after the job
- What was the root cause of the original failure, and has it been corrected?
- Which firmware version is now running on the new board and mainboard?
- Were all head voltages entered from the head labels and double-checked?
- Were any cables replaced, and which ones?
- Which calibration steps were completed, and what values changed?
- What should operators watch for during the first week?
- Can the old board be repaired as a spare?
Write the answers in your maintenance log. They help any future technician understand the machine’s history quickly and make the next flex carriage board replacement much faster. If the technician cannot answer some of these questions clearly, ask for a follow-up visit before the machine goes back into heavy production, especially before an election or festival rush.
Further reading: An antistatic wrist strap or similar device is a simple, inexpensive way to protect boards during installation.
Key takeaways
- Confirm the diagnosis and match the board exactly before replacing it.
- Record head voltages, settings and calibration before removing the old board.
- Install with power off, ESD precautions and careful cable handling.
- Enter correct head voltages before printing; never use defaults.
- Calibrate fully and monitor the machine closely for the first week.
Planning a carriage board replacement on your flex machine? Unified Engineering Dynamics can help you confirm compatibility, source the right board and plan the job to minimise downtime.
More in the flex carriage board series
- Flex Machine Head Carriage Board Explained
- Konica Head Board Failure Symptoms
- Hoson vs Senyang vs BYHX Carriage Boards for Konica
- 4-Head vs 8-Head Carriage Board Upgrade
- Solvent Ink Leaks and Carriage Board Damage
- Head Data Cable vs Carriage Board Fault
- Burnt Head Board After Konica Head Change
- Flex Machine Carriage Board Price in India
- Flex Carriage Board Connectors: Handling Rules
Related reading on our site: Konica KM512i printhead price and lifespan, KM512i vs KM1024i printheads, flex printer mainboard and head board buyer checks, data and printhead cable handling and the flex printing machine maintenance checklist.
Running an Epson-head eco-solvent machine as well? Our sister series starts with the eco-solvent head carriage board guide and the complete guide to eco-solvent printer electronics.
Frequently Asked Questions
Do I need to update firmware after replacing a carriage board?
Not always. Check whether the new board’s firmware matches your mainboard and software. Update only with the exact file your supplier confirms, and never interrupt the update.
What happens if I print with default head voltages on a new board?
Default values may be too high or too low for your heads, causing weak printing or overheating and shortened head life. Always enter each head’s label voltage first.
Should I replace head cables when replacing the carriage board?
After a burnt-board event, yes, it is good practice. Otherwise, inspect each cable and replace any that are creased, discoloured or contaminated.
How long does a carriage board replacement take?
With the correct board and good records, a technician can often complete replacement and calibration in a few hours. Missing records or compatibility issues can extend it to days.
Can I back up my settings before replacing the board?
Many board systems allow parameter export. Save the file to a USB drive and another computer, and also note key values on paper.
Why did my new carriage board fail soon after installation?
Common causes are a shorted head, damaged cable, wrong voltage, incompatible version or an unresolved power or earthing problem. Find the root cause before fitting another board.
Can I reuse my old board’s settings file on the new board?
Often yes, if the board system and versions match. Some values such as head voltages should still be checked manually against head labels after loading the file.
Should calibration be repeated even if the new board is identical?
Yes. Small differences in board timing and the disturbance of reconnecting heads can change alignment, so always run nozzle checks and calibration after replacement.